Thursday, May 01, 2008

Garage Gravel and Main House Footers


It rained last weekend, but we managed to get our temporary house numbers up to make it easier for future construction deliveries to find us, and it was dry enough for Chris and Richard to continue construction. Concrete blocks were built up atop the poured concrete footers for the garage.


While there are some gaps and cracks in the foundation cinder blocks, we are told that they will self-seal once more concrete is poured into them.

The interior space was then filled with gravel.


The dumpster was also delivered so trash now has a proper home. (Note: the intent is to recycle or burn as much as possible on-site since hauling the trash off the property and dumping it can be quite expensive.)


The remaining earth below the future main house was also cleared and, much like the garage, channels were dug with the excavator and filled with concrete to form what is essentially the footprint of the house. It may look small, but remember that there are really 3 levels (basement, main floor, and second floor) plus a porch on front and back. As always, you can click any of the above photos for enlargements and the full construction gallery.

No comments: